Fountain logo Industrial activities
   
Menu: Home_small
Menu: SiteAssessment
Menu: FacilityDesign
Menu: Compliance
Menu: StorageTanks
Menu: Maintenance
Menu: SiteCharacterization
Menu: RemedialDesign
Menu: Remediation
Menu: WaterTreatment
Menu: WasteManagement
Project: maintenance
Nav: Prev Nav: Next

Client:
Project:
Value:

Fixed Base Operator
Jet Fuel UST Maintenance
$3,000

Project: mn_02


A fixed base operator was experiencing air bubbles and loss of prime in their jet fuel underground tank suction piping. FRC performed a tank entry under confined space permit conditions to diagnose and rectify the situation. FRC identified a loose threaded connection where the floating suction exited the tank top as the source of the air leak and tightened the connection. While inside the tank, FRC cleaned it and inspected the lining.

 

Home   Services   Projects   People   Contact

Copyright © 2013   The Fourth River Company.   All rights reserved.