Fountain logo Industrial activities
   
Menu: Home_small
Menu: SiteAssessment
Menu: FacilityDesign
Menu: Compliance
Menu: StorageTanks
Menu: Maintenance
Menu: SiteCharacterization
Menu: RemedialDesign
Menu: Remediation
Menu: WaterTreatment
Menu: WasteManagement
Project: remedialdesign
Nav: Prev Nav: Next

Client:
Project:
Value:

Pittsburgh School District
UST Corrective Action
$26,000

Project: rd_01


FRC prepared detailed plans and specifications for the upgrade and change in service of two 10,000-gallon fiberglass USTs and associated dispensers and suction pumping systems at a school district facilities service center. One gasoline tank was changed from gasoline to diesel fuel service. FRC specified an electronic leak detection system and a card reader system and interfaced them with the facility computer network. When the piping replacement identified a release, FRC performed UST corrective action, including monitoring well installation, groundwater sampling, soil sampling, site characterization report preparation, aquifer non-use determination, remedial action plan preparation, attainment demonstration, and well abandonment.

 

Home   Services   Projects   People   Contact

Copyright © 2013   The Fourth River Company.   All rights reserved.