FRC performed the final phase of remediation at
the site of a fuel farm spill. FRC dewatered a
groundwater interceptor trench that had been used
to contain and separate a jet fuel release. The
dewatering effluent was treated and pumped to the
sanitary sewer under a permit. FRC transported
the sludge remaining in the trench to a
solidification facility, where it was mixed with
cement kiln dust and landfilled.
|